Client: Tapi Carpets & Floors Duration: 5 weeks Location: Luton

Project Summary

Acting as principal contractor, 7formation were tasked with the demolition and removal works of the existing steel frame and block work mezzanine to the rear of the store.

The existing perimeter block walls were over-boarded in readiness to receive the Tapi fixture and fittings. A jumbo stud wall was erected to split the sales area from the warehouse. Bespoke light rafts and flooring displays completed the installation.