Project Description

Client: Pure Gym
Location: St Albans
Duration: 9 weeks

The building to receive the mezzanine was located on a busy commercial estate, in a bustling St Albans suburb. Transport Segregation and coordination with Facility Management were key. 7 Formation carried out a suitability test of the Main Concrete Slab by means of core samples to confirm makeup and any unexpected structural characteristics. The build was carried out over a 2 week period and due to project critical PC dates, was installed following an accelerated program. The Mezzanine was designed to limit the number of legs required for a clean visual appearance when entering the building. Also, taking into consideration the client’s preferred accommodation and equipment layout, to maximise their use of the space below. This required significant design coordination between 7 Formation and the Clients Architects to achieve the desired look. The Mezzanine was finished with a full underdrawn FR60 MF Ceiling. Decorative column cases were installed to complete the look.
In all this was a smoothly operated build, which met the difficult and strict criteria through design to completion, to deliver a product that was not only functional but suited the client’s design needs.’

Long Term Relationship

7formation began its relationship with Pure Gym in 2015, with its first gymnasium located at Kirkstall, Leeds. We’re proud to continue our relationship with Pure Gym and a list below of the project thus far. Leeds, Orpington, Stafford, Leicester, Sheffield, Folkstone, West Brom, Hunslet, Cambridge, Corby, Edgeware,  Mansfield, Glossop, St Albans, Weston Favell, Aldershot, Stockport.