Project Description
Location: Wellington Somerset
Duration: 26
Acting as principal contractor, 7formation were tasked with the internal refurbishment of the PRITEX Factory Building, in conjunction with the reconfiguration to the existing parking area’s and the approach roads serving the factory located at Wellington – Somerset. External works included the forming of a new entrance and the installation of automatic gates and barriers. An extensive re-work of the roads and car park areas to a lorry grade finish, including surface water drainage, perimeter fencing, traffic management, and a new led lighting scheme and car charging facility. The internal works required careful planning with the works phased to allow the factory to remain fully functional. These works included the installation of a mezzanine, the forming and the fit-out of a new laboratory test area, office, canteen, and storage, along with a new engineering area and welding bay. The project was completed on programme and within budget.