7formation successfully completed a multi-phase refurbishment project at Cadbury World, enhancing two specified areas along the popular tour route.
The scope of works included the strip-out of existing floor coverings and partition walls, followed by comprehensive wall decoration and ceiling spraying. New suspended ceilings were installed, and the flooring was reconfigured with wooden ramps for improved accessibility.
In the back-of-house area, a new kitchen was fitted. Structural alterations included forming an opening in the front elevation and installing a new automatic door set. The project also involved the relocation of existing air conditioning units and full electrical works, comprising both first and second fixes to lighting and power points, ensuring modern functionality throughout the refreshed visitor experience.
Key Facts
Value
£1,350,000
Client
Merlin Entertainments / Cadbury World
Location
Birmingham
Duration
16 Weeks
Sector
Retail



Project Team


Michael Fitzpatrick
Contracts Director

Ben Allen
Project Manager

Jacob Smith
Quantity Surveyor